How To Fix /SAPPCE/PNV005 - WBS element & is not valid for construction progress report


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 005

  • Message text: WBS element & is not valid for construction progress report

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/PNV005 - WBS element & is not valid for construction progress report ?

    The SAP error message /SAPPCE/PNV005 WBS element & is not valid for construction progress report typically occurs in the context of project management, particularly when dealing with construction progress reporting in SAP Project System (PS) or related modules. This error indicates that the specified Work Breakdown Structure (WBS) element is not valid for the construction progress report you are trying to generate or process.

    Causes:

    1. WBS Element Status: The WBS element may be in a status that does not allow for progress reporting. For example, it might be locked, closed, or not yet released.
    2. Incorrect WBS Element: The WBS element specified may not be correctly defined or may not exist in the system.
    3. Missing Configuration: The configuration for construction progress reporting may not be set up correctly in the system.
    4. Authorization Issues: The user may not have the necessary authorizations to access or report on the specified WBS element.
    5. Project Structure: The WBS element may not be part of the project structure that is defined for construction progress reporting.

    Solutions:

    1. Check WBS Element Status: Verify the status of the WBS element in the system. Ensure it is released and not in a closed or locked state.
    2. Validate WBS Element: Confirm that the WBS element exists and is correctly defined in the system. You can do this by navigating to the WBS element in the project structure.
    3. Review Configuration: Check the configuration settings for construction progress reporting in SAP. Ensure that the necessary settings are in place for the WBS elements you are trying to report on.
    4. Authorization Check: Ensure that the user has the appropriate authorizations to access and report on the WBS element. This may involve checking user roles and permissions.
    5. Project Structure Review: Ensure that the WBS element is part of the project structure that is set up for construction progress reporting. If it is not, you may need to adjust the project structure or include the WBS element in the relevant project.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) to check the WBS element and its status, or CJ03 (Display WBS) to view details about the WBS element.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuration and troubleshooting.
    • Documentation: Refer to SAP documentation on Project System and construction progress reporting for detailed information on setup and requirements.

    If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Project System for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker