Message type: E = Error
Message class: /SAPPCE/ORGM1 -
Message number: 100
Message text: *************** Messages 100 - 200 for Subproject Reporting ************
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/ORGM1100
- *************** Messages 100 - 200 for Subproject Reporting ************ ?The SAP error message /SAPPCE/ORGM1100 typically relates to issues encountered in the context of subproject reporting within the SAP system, particularly in the Project System (PS) module. This error message indicates that there are problems with the configuration or data related to subprojects.
Cause: Missing Configuration: The error may arise due to missing or incorrect configuration settings in the Project System. Data Inconsistencies: There may be inconsistencies in the data related to the subprojects, such as missing master data or incorrect assignment of resources. Authorization Issues: Users may not have the necessary authorizations to access or report on the subprojects. Incorrect Reporting Structure: The reporting structure for subprojects may not be set up correctly, leading to issues when generating reports.
Solution: Check Configuration: Review the configuration settings for the Project System and ensure that all necessary settings for subproject reporting are correctly configured. Data Validation: Validate the data related to the subprojects. Ensure that all required master data
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPPCE/ORGM1032
Enter a start date that lies before the end date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/ORGM1031
*** Messages 031 - 060 for check report for proj. enterprise structure***
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/ORGM1101
End date &1 is before the start date &2 (BUKRS/PARTN: &3/&4)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/ORGM1102
Enter only one additional selection criterion
What causes this issue? You have specified more than one additional selection criteria.System Response The system issues an error message and will n...
Click on this link to search all SAP messages.