Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/JVAM1 -
Message number: 041
Message text: Enter either the cost center or the WBS element, not both
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/JVAM1041
- Enter either the cost center or the WBS element, not both ?The SAP error message
/SAPPCE/JVAM1041
indicates that when entering data in a transaction related to project accounting or cost management, the system requires you to specify either a cost center or a Work Breakdown Structure (WBS) element, but not both at the same time. This is a validation rule in SAP to ensure that the data entered is consistent and adheres to the business logic defined in the system.Cause:
The error occurs when both a cost center and a WBS element are entered in the same transaction or screen. This is typically seen in transactions related to project accounting, where the system expects a clear distinction between costs that are allocated to a project (WBS element) and those that are allocated to a department or cost center.
Solution:
To resolve this error, you should:
Review Your Input: Check the fields where you have entered the cost center and WBS element. Ensure that you only fill in one of these fields.
Decide on the Allocation: Determine whether the costs should be allocated to a cost center or a WBS element based on your business requirements.
Modify Your Entry:
- If you want to allocate costs to a cost center, remove the WBS element from your entry.
- If you want to allocate costs to a WBS element, remove the cost center from your entry.
Re-submit the Transaction: After making the necessary adjustments, try to save or process the transaction again.
Related Information:
Transaction Codes: This error can occur in various transaction codes related to project accounting, such as CJ20N (Project Builder), CJ01 (Create Work Breakdown Structure), or others where cost allocations are made.
Configuration Settings: The behavior of cost center and WBS element entries can be influenced by configuration settings in the SAP system. If you believe that the system should allow both entries in certain scenarios, you may need to consult with your SAP configuration team to review the settings.
Documentation: Refer to SAP documentation or help files for more details on project accounting and cost management to understand the implications of using cost centers versus WBS elements.
User Training: Ensure that users are trained on the correct procedures for entering data in the relevant transactions to avoid this error in the future.
By following these steps, you should be able to resolve the error and proceed with your transaction in SAP.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/JVAM1040
Enter the cost center or WBS element
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/JVAM1039
An equity group with this valid-from data already exists
What causes this issue? You cannot define two equity groups for the same venture with the same valid-from date.System Response The system issues an ...
/SAPPCE/JVAM1042
Operator is different from the joint venture operator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/JVAM1043
Valid-from date must lie after &1
What causes this issue? You cannot enter a valid-from date that lies before the valid-from date for equity groups already existing for this joint ven...
Click on this link to search all SAP messages.