Message type: E = Error
Message class: /SAPPCE/DPCM1 -
Message number: 143
Message text: You can only assign one WBS element for each contract
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/DPCM1143
- You can only assign one WBS element for each contract ?The SAP error message
/SAPPCE/DPCM1143
indicates that you are trying to assign more than one Work Breakdown Structure (WBS) element to a contract, which is not allowed in the system. This restriction is typically in place to maintain the integrity of project accounting and ensure that each contract is linked to a single WBS element for tracking purposes.Cause:
- Multiple WBS Assignment: The primary cause of this error is that the system is configured to allow only one WBS element per contract, and an attempt is being made to assign multiple WBS elements.
- Incorrect Configuration: There may be a configuration issue in the project system settings that is not allowing the assignment as intended.
- Data Entry Error: The user may have inadvertently selected multiple WBS elements during the assignment process.
Solution:
- Review Assignment: Check the contract and ensure that only one WBS element is assigned. If multiple WBS elements are selected, remove the additional ones and keep only the required WBS element.
- Check Configuration: If you believe that the business process requires multiple WBS elements, consult with your SAP administrator or project manager to review the configuration settings in the Project System (PS) module. They may need to adjust the settings or provide guidance on how to handle your specific scenario.
- Use Alternative Structures: If your business process requires tracking multiple WBS elements, consider using alternative structures such as creating sub-projects or using network activities that can be linked to the main contract.
- Consult Documentation: Refer to SAP documentation or help resources for more detailed information on WBS and contract assignments.
Related Information:
If the issue persists after following these steps, it may be beneficial to reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/DPCM1142
WBS element &1 does not have the required status
What causes this issue? Status <LB>Open</> or <LB>Released </> must be active for the WBS element.System Response The system...
/SAPPCE/DPCM1141
WBS element &1 is not a billing element
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/DPCM1144
WBS element &1 is statistical; Enter a real account assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/DPCM1150
Internal error deleting a row
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.