Message type: E = Error
Message class: /SAPPCE/DPCM1 -
Message number: 044
Message text: Percentage for account assignment exceeds 100%; check input
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/DPCM1044
- Percentage for account assignment exceeds 100%; check input ?The SAP error message /SAPPCE/DPCM1044 Percentage for account assignment exceeds 100%; check input typically occurs in the context of project accounting or cost allocation within SAP. This error indicates that the total percentage allocated to different account assignments exceeds 100%, which is not permissible.
Cause: Incorrect Percentage Allocation: The most common cause is that the sum of the percentages assigned to various account assignments (e.g., cost centers, internal orders, etc.) exceeds 100%. For example, if you have three account assignments with percentages of 50%, 30%, and 30%, the total is 110%, which triggers this error. Data Entry Errors: Manual data entry mistakes can lead to incorrect percentage values being inputted.
Configuration Issues: In some cases, the configuration of the project or cost allocation settings may not be set up correctly, leading to this error.
Solution: Review Account Assignments: Check the account assignments in the transaction or document where the error occurred. Ensure that the total percentage
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPPCE/DPCM1043
Enter a percentage for account assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/DPCM1042
Enter a G/L account
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/DPCM1045
Sum of distribution percentages &1 must equal 100 or have a blank value
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/DPCM1046
You can only assign to WBS elements belonging to the same project
What causes this issue? You have already maintained WBS elements in the account assignment for project &V1&. The specified WBS element &V...
Click on this link to search all SAP messages.