How To Fix /SAPPCE/01020 - Change in WBS Element/Network should belong to the same project


/SAPPCE/01020 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/01 -

  • Message number: 020

  • Message text: Change in WBS Element/Network should belong to the same project

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/01020 - Change in WBS Element/Network should belong to the same project ?
    The SAP error message /SAPPCE/01020 Change in WBS Element/Network should belong to the same project typically occurs in the context of project management within SAP, particularly when dealing with Work Breakdown Structures (WBS) and networks. This error indicates that there is an attempt to change a WBS element or network that is not associated with the same project as the one currently being processed.
    
    Cause: Project Association: The WBS element or network you are trying to modify is linked to a different project than the one you are currently working on. Data Entry Error: There may have been a mistake in data entry, where the wrong WBS element or network was selected. System Configuration: In some cases, the system configuration or settings may restrict changes to WBS elements or networks that are not part of the same project.
    Solution: Verify Project Association: Check the project to which the WBS element or network is assigned. Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker