Message type: E = Error
Message class: /SAPMP/PP_BD -
Message number: 005
Message text: Max. prod. length must be greater than the fixed scrap for any length
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPMP/PP_BD005
- Max. prod. length must be greater than the fixed scrap for any length ?The SAP error message
/SAPMP/PP_BD005 Max. prod. length must be greater than the fixed scrap for any length
typically occurs in the context of production planning and control, particularly when dealing with production orders or routing in SAP. This error indicates that the maximum production length defined for a particular operation or material is not sufficient to cover the fixed scrap that has been defined.Cause:
- Fixed Scrap Definition: The fixed scrap defined for the production process is greater than or equal to the maximum production length. This means that the system cannot allocate enough length for the production process after accounting for the scrap.
- Configuration Issues: There may be incorrect settings in the material master or routing that define the maximum production length and fixed scrap.
- Data Entry Errors: Incorrect data entry while defining the production parameters, such as maximum production length or fixed scrap.
Solution:
Review and Adjust Parameters:
- Go to the material master (transaction code
MM02
) and check the production parameters for the relevant material. Ensure that the maximum production length is greater than the fixed scrap.- If necessary, increase the maximum production length to accommodate the fixed scrap.
Check Routing:
- Review the routing for the production order (transaction code
CA03
) and ensure that the fixed scrap is correctly defined and that the maximum production length is appropriately set.Adjust Fixed Scrap:
- If the fixed scrap is set too high, consider adjusting it to a more reasonable value that allows for production without exceeding the maximum length.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on setting up production parameters and understanding the implications of fixed scrap and maximum production length.
Testing:
- After making adjustments, test the changes by creating a new production order to ensure that the error does not occur again.
Related Information:
MM02
: Change Material MasterCA03
: Display RoutingCO01
: Create Production OrderBy following these steps, you should be able to resolve the error and ensure that your production planning processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
/SAPMP/PP_BD004
Fixed scrap first and last length values were deleted
What causes this issue? You tried to create or change a bill of material (BOM) or a routing. This is not possible because at least one of the fields ...
/SAPMP/PP_BD003
Fixed scrap first and last lengths contain values
What causes this issue? You tried to create or change a bill of material (BOM) or a routing. This is not possible because at least one of the fields ...
/SAPMP/PP_BD006
Max. prod. length must be a whole multiple of the rounding value
What causes this issue? The rounding value is greater than the maximum production length, or the maximum production length is not a whole-number mult...
/SAPMP/PP_BD007
Component & is a length-based material, unlike header material &
What causes this issue? You attempted to enter a length-based material as a component in a BOM, despite the fact that the header material is not a le...
Click on this link to search all SAP messages.