How To Fix SAPLWSAO053 - No planning calendars have been entered in plant &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SAPLWSAO - Messages for SAP Retail Store Store Order

  • Message number: 053

  • Message text: No planning calendars have been entered in plant &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SAPLWSAO053 - No planning calendars have been entered in plant &1 ?

    The SAP error message SAPLWSAO053 indicates that no planning calendars have been defined for a specific plant in the system. This error typically arises in the context of production planning or materials management when the system attempts to perform operations that require a planning calendar, such as scheduling or capacity planning.

    Cause:

    The primary cause of this error is the absence of a planning calendar for the specified plant. A planning calendar is essential for defining working days, holidays, and other time-related parameters that affect production and planning processes.

    Solution:

    To resolve this error, you need to ensure that a planning calendar is assigned to the relevant plant. Here are the steps to do this:

    1. Access the Planning Calendar Configuration:

      • Go to the SAP Easy Access screen.
      • Navigate to the following path:
        Logistics -> Production -> Master Data -> Work Center -> Define Work Center
      • Alternatively, you can use transaction code CR01 (Create Work Center) or CR02 (Change Work Center).
    2. Assign a Planning Calendar:

      • In the work center configuration, look for the field related to the planning calendar.
      • If no planning calendar is assigned, you will need to create one or assign an existing one.
      • To create a new planning calendar, navigate to:
        Logistics -> Production -> Master Data -> Work Center -> Define Planning Calendar
      • Define the working days, holidays, and other relevant parameters.
    3. Check Plant Settings:

      • Ensure that the planning calendar is correctly assigned to the plant in the configuration settings.
      • You can check this in the plant settings under:
        Logistics -> General -> Plant Data/Branch -> Define Plant
    4. Test the Configuration:

      • After assigning the planning calendar, test the configuration by attempting the operation that previously triggered the error.

    Related Information:

    • Transaction Codes:

      • CR01: Create Work Center
      • CR02: Change Work Center
      • CR03: Display Work Center
      • SPRO: Access the SAP Customizing Implementation Guide for configuration.
    • Documentation:

      • Refer to SAP Help documentation for detailed information on work centers and planning calendars.
    • User Roles:

      • Ensure that you have the necessary authorizations to make changes to work center and planning calendar settings.

    By following these steps, you should be able to resolve the error message SAPLWSAO053 and ensure that your planning processes can proceed without issues.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant