Do you have any question about this error?
Message type: E = Error
Message class: /SAPCEM/PT -
Message number: 205
Message text: Requirement &/& has been planned successfully for equipment &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPCEM/PT205
- Requirement &/& has been planned successfully for equipment & ?The SAP error message
/SAPCEM/PT205 Requirement &/& has been planned successfully for equipment &
typically indicates that a requirement (such as a maintenance task or production order) has been successfully planned for a specific piece of equipment. This message is not necessarily an error but rather an informational message indicating that the planning process has been completed.Cause:
- Successful Planning: The message is generated when the planning of a requirement for a specific equipment is completed successfully. It indicates that the system has processed the requirement without any issues.
- System Configuration: The message may also be related to the configuration of the SAP system, particularly in the context of maintenance planning or production planning modules.
Solution:
Since this message is informational and indicates successful planning, there is typically no action required. However, if you are looking to ensure that everything is functioning correctly, you can:
- Verify the Requirement: Check the details of the planned requirement to ensure that it meets your expectations and that all necessary parameters are correctly set.
- Review Planning Results: Look at the planning results in the relevant transaction (e.g., IP10 for maintenance planning) to confirm that the requirements are as intended.
- Monitor Equipment Status: Ensure that the equipment for which the requirement has been planned is in the correct status for the planned activities (e.g., not in maintenance mode if it needs to be operational).
Related Information:
If you encounter any issues or if the message is accompanied by other error messages, it may be necessary to investigate further or consult with your SAP support team for assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPCEM/PT204
Equipment &1 has been on recipient &3 since &2
What causes this issue? Equipment &V1& has already been sent to recipient &V3&. It is not necessary to send it to this recipient agai...
/SAPCEM/PT203
Requirement &1/&2 clashes with dates in shipping document &3/&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPCEM/PT206
Equipment & has already been planned for recipient & (requirement &/&)
What causes this issue? You want to plan a requirement for equipment &V1&. However, requirement &V3&/&V4& for recipient &...
/SAPCEM/PT207
Requirement &/& has been removed from planning successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.