How To Fix /SAPCE/FKRU020 - End date &1 of add. sheet should be before start date &2 of main sheet


/SAPCE/FKRU020 - Overview

  • Message type: E = Error

  • Message class: /SAPCE/FKRU -

  • Message number: 020

  • Message text: End date &1 of add. sheet should be before start date &2 of main sheet

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPCE/FKRU020 - End date &1 of add. sheet should be before start date &2 of main sheet ?
    The SAP error message /SAPCE/FKRU020 indicates that there is a date inconsistency between an additional sheet and a main sheet in the context of a financial or controlling document. Specifically, the error states that the end date of the additional sheet should be before the start date of the main sheet. This typically occurs in scenarios involving planning, budgeting, or financial reporting where date ranges are critical.
    
    Cause: Date Range Overlap: The end date of the additional sheet (e.g., a planning or budget sheet) overlaps or is equal to the start date of the main sheet. Incorrect Data Entry: Users may have entered the dates incorrectly, leading to this inconsistency.
    Configuration Issues: There may be issues with the configuration of the planning or reporting module that enforces date constraints.
    Solution: Check Dates: Review the dates in both the additional sheet and the main sheet. Ensure that the end date of the additional sheet is indeed before

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant