Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/TT -
Message number: 033
Message text: From-date to To-date is not allowed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/TT033
- From-date to To-date is not allowed ?The SAP error message
/SAPAPO/TT033 From-date to To-date is not allowed
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the date range specified for a planning operation, such as a planning run or a forecast.Cause:
- Invalid Date Range: The "From-date" is later than the "To-date". This means that the start date for the planning period is set after the end date, which is logically incorrect.
- Date Format Issues: The dates may not be in the expected format, leading to misinterpretation by the system.
- Planning Horizon: The specified date range may fall outside the defined planning horizon in the system settings.
- Calendar Settings: There may be issues with the calendar settings, such as non-working days or holidays that affect the date range.
Solution:
- Check Date Inputs: Verify that the "From-date" is earlier than the "To-date". Adjust the dates accordingly.
- Correct Date Format: Ensure that the dates are entered in the correct format as expected by the system (e.g., YYYY-MM-DD).
- Review Planning Horizon: Check the planning horizon settings in the APO system to ensure that the specified date range falls within the allowed limits.
- Adjust Calendar Settings: Review the calendar settings to ensure that there are no conflicts or issues that might affect the date range.
- Testing: After making adjustments, re-run the planning operation to see if the error persists.
Related Information:
/SAPAPO/DP
(for Demand Planning) or /SAPAPO/SNP
(for Supply Network Planning) to access the relevant planning functions.If the issue persists after checking these aspects, it may be beneficial to consult with your SAP Basis or APO support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/TT032
Validity area &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TT031
Validity area &1 already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TT034
Validity area has been violated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TT050
Itinerary &1 has been saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.