How To Fix /SAPAPO/TT028 - Vehicle resource is already being used for schedule &1


/SAPAPO/TT028 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/TT -

  • Message number: 028

  • Message text: Vehicle resource is already being used for schedule &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/TT028 - Vehicle resource is already being used for schedule &1 ?
    The SAP error message /SAPAPO/TT028 Vehicle resource is already being used for schedule &1 typically occurs in the SAP Advanced Planning and Optimization (APO) module when a vehicle resource is being scheduled for multiple tasks or orders at the same time. This can happen in scenarios where the same vehicle is assigned to different transportation orders or activities that overlap in time.
    
    Cause: Overlapping Schedules: The vehicle is already assigned to another transportation order or task that overlaps with the new schedule you are trying to create. Resource Allocation: The vehicle resource is not configured to handle multiple assignments simultaneously. Planning Constraints: There may be constraints in the planning settings that prevent the same vehicle from being used for multiple schedules.
    Solution: Check Existing Assignments: Review the current assignments for the vehicle resource in the system. Identify any overlapping schedules and resolve them by either rescheduling or reallocating the vehicle. Adjust Scheduling: If possible, adjust the timing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author