Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/TSM -
Message number: 714
Message text: Maintain time-based disaggreg. key figure for time-based disaggreg. 'K'
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/TSM714
- Maintain time-based disaggreg. key figure for time-based disaggreg. 'K' ?The SAP error message
/SAPAPO/TSM714
typically relates to issues with maintaining a time-based disaggregation key figure in the SAP Advanced Planning and Optimization (APO) module. This error can occur when there are inconsistencies or issues with the configuration of the key figure or its associated settings.Cause:
- Missing Configuration: The time-based disaggregation key figure may not be properly configured in the system.
- Data Inconsistencies: There may be inconsistencies in the data that the key figure is trying to process.
- Authorization Issues: The user may not have the necessary authorizations to maintain the key figure.
- Incorrect Time Periods: The time periods defined for the disaggregation may not align with the data being processed.
- Technical Issues: There could be underlying technical issues in the APO system or database.
Solution:
Check Configuration:
- Go to the configuration settings for the time-based disaggregation key figure and ensure that all necessary parameters are correctly set.
- Verify that the key figure is defined correctly in the planning area.
Data Validation:
- Check the data associated with the key figure for any inconsistencies or missing entries.
- Ensure that the data is complete and correctly formatted.
User Authorizations:
- Verify that the user has the necessary authorizations to maintain the key figure. This can be checked in the user roles and authorizations settings.
Review Time Periods:
- Ensure that the time periods defined for the disaggregation are correct and that they match the data being processed.
Technical Support:
- If the issue persists, consider reaching out to your SAP Basis or technical support team to investigate any underlying technical issues.
SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message. There may be patches or updates that resolve known issues.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/TSM713
Maintain time-based disaggregation key figure for calculation type K
STYLE S_DOCUS1 The system issues an error message and will not allow you to continue with this transaction until the error is resolved. What causes t...
/SAPAPO/TSM712
Maintain disaggregation key figure for calculation types P or I
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. What causes this issue? In ...
/SAPAPO/TSM717
Standard SNP planning level created successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TSM718
Standard SNP planning level &1 was activated for &2
What causes this issue? The transported standard SNP planning level had a different status than that of the planning object structure that the standa...
Click on this link to search all SAP messages.