How To Fix /SAPAPO/TSM619 - Extended DP BOM check will be carried out


/SAPAPO/TSM619 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/TSM -

  • Message number: 619

  • Message text: Extended DP BOM check will be carried out

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/TSM619 - Extended DP BOM check will be carried out ?
    The SAP error message /SAPAPO/TSM619 indicates that an extended check for the Bill of Materials (BOM) is being performed in the context of Demand Planning (DP) within the Advanced Planning and Optimization (APO) module. This message typically arises when there are issues related to the BOM configuration or its integration with the planning process.
    
    Cause: BOM
    Configuration Issues: The BOM may not be correctly configured or may have missing components. Data Inconsistencies: There could be inconsistencies in the master data, such as material master records or BOM records. Planning Object Structure: The planning object structure may not be set up correctly to accommodate the BOM. Versioning Issues: The version of the BOM being used may not match the version expected by the planning process. Missing Dependencies: There may be dependencies or relationships between materials that are not properly defined.
    Solution: Check BOM Configuration: Review the BOM configuration in the system to ensure that all components are correctly defined

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant