How To Fix /SAPAPO/TSM086 - Data partly before horizon &1 to &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/TSM -

  • Message number: 086

  • Message text: Data partly before horizon &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/TSM086 - Data partly before horizon &1 to &2 ?
    The SAP error message /SAPAPO/TSM086 Data partly before horizon &1 to &2 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with time series data in the context of planning and forecasting.
    
    Cause: This error indicates that there is a mismatch between the planning horizon defined in the system and the data being processed. Specifically, it means that some of the data you are trying to access or process falls outside the defined planning horizon. The planning horizon is the time frame within which the system is expected to perform planning activities, and any data that falls outside this range will trigger this error.
    Solution: To resolve this error, you can take the following steps: Check Planning Horizon Settings: Go to the configuration settings for your planning area in SAP APO. Verify the planning horizon settings to ensure they are correctly defined. You may need to extend the planning horizon if

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant