How To Fix /SAPAPO/TS_RLG_CPY133 - End of check of DP PPM relationships for planning object structure &1


/SAPAPO/TS_RLG_CPY133 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/TS_RLG_CPY -

  • Message number: 133

  • Message text: End of check of DP PPM relationships for planning object structure &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/TS_RLG_CPY133 - End of check of DP PPM relationships for planning object structure &1 ?
    The SAP error message /SAPAPO/TS_RLG_CPY133 typically occurs in the context of Demand Planning (DP) within SAP Advanced Planning and Optimization (APO). This error indicates that there is an issue with the relationships between the Planning Object Structures (POS) and the corresponding Production Planning and Detailed Scheduling (PP/DS) or Demand Planning (DP) PPM (Product-Process Model) relationships.
    
    Cause: The error can be caused by several factors, including: Inconsistent Data: There may be inconsistencies in the data related to the planning object structures or PPMs. This could be due to missing or incorrect entries in the master data. Incorrect Configuration: The configuration of the planning object structures or the PPM relationships may not be set up correctly, leading to conflicts during the check process. Missing Relationships: There might be missing relationships between the planning object structures and the PPMs that are required for the planning process. Data Integrity Issues: Issues with data integrity, such as orphaned records or incorrect

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant