Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/TS_RLG_CPY -
Message number: 127
Message text: Realignment is not being performed for at least one output product
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/TS_RLG_CPY127
- Realignment is not being performed for at least one output product ?The SAP error message
/SAPAPO/TS_RLG_CPY127
indicates that realignment is not being performed for at least one output product in the context of SAP Advanced Planning and Optimization (APO). This error typically arises during the realignment process in the Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS) modules.Cause:
The error can be caused by several factors, including:
- Missing Master Data: The output product may not have the necessary master data (e.g., product master, location master) set up correctly.
- Planning Version Issues: The planning version being used may not be correctly configured or may not contain the necessary data for the output product.
- Product Availability: The output product may not be available for planning due to stock issues or other constraints.
- Configuration Issues: There may be configuration issues in the SNP or PP/DS settings that prevent realignment from being executed for certain products.
- Data Inconsistencies: There may be inconsistencies in the data that prevent the realignment process from being completed successfully.
Solution:
To resolve the error, you can take the following steps:
Check Master Data: Ensure that all necessary master data for the output product is correctly maintained. This includes checking the product master, location master, and any relevant planning parameters.
Review Planning Version: Verify that the planning version being used is correct and contains the necessary data for the output product. You may need to activate or adjust the planning version.
Analyze Product Availability: Check the availability of the output product in the system. Ensure that there are no stock issues or other constraints that would prevent realignment.
Configuration Review: Review the configuration settings in SNP or PP/DS to ensure that they are set up correctly for the output product. This may involve checking the realignment settings and ensuring that they are appropriate for the product.
Data Consistency Check: Perform a data consistency check to identify any inconsistencies that may be affecting the realignment process. This can include checking for missing or incorrect data in the relevant tables.
Logs and Traces: Check the logs and traces for more detailed error messages or warnings that may provide additional context for the issue.
Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
Contact SAP Support: If the issue persists after performing the above checks, consider reaching out to SAP support for further assistance.
Related Information:
/SAPAPO/SDP94
(for SNP planning) or /SAPAPO/PPDS
(for PP/DS planning) to analyze planning data.By following these steps, you should be able to identify the root cause of the error and implement a solution to allow realignment to be performed successfully for the output product.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/TS_RLG_CPY126
Indicator "Delete Source" is not selected
What causes this issue? If the characteristic value combinations that are relevant to DP BOMs are to be changed, the original characteristic value co...
/SAPAPO/TS_RLG_CPY125
The step definition for step &1 could not be changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TS_RLG_CPY128
Relationships in planning area &1 could not be checked
What causes this issue? The consistency check for planning area &1 could not find a valid planning version.System Response The system issues an ...
/SAPAPO/TS_RLG_CPY129
DP PPM relationships for plng area &1, version &2 were checked/repaired
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.