How To Fix /SAPAPO/TS_RLG_CPY035 - Realignment was not performed for planning area &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/TS_RLG_CPY -

  • Message number: 035

  • Message text: Realignment was not performed for planning area &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/TS_RLG_CPY035 - Realignment was not performed for planning area & ?

    The SAP error message /SAPAPO/TS_RLG_CPY035 indicates that a realignment process was not performed for a specified planning area in SAP Advanced Planning and Optimization (APO). This error typically arises during the execution of a realignment process, which is essential for ensuring that the data in the planning area is consistent and up-to-date.

    Cause:

    The error can be caused by several factors, including:

    1. Missing or Incomplete Data: The planning area may not have the necessary data or configuration required for the realignment process to execute successfully.

    2. Configuration Issues: There may be issues with the configuration of the planning area, such as incorrect settings in the master data or planning objects.

    3. Locking Issues: The planning area might be locked by another process or user, preventing the realignment from being executed.

    4. Technical Errors: There could be underlying technical issues, such as database problems or system performance issues, that prevent the realignment from completing.

    5. Versioning Issues: If there are multiple versions of the planning area, the system may not be able to determine which version to realign.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Data Completeness: Ensure that all necessary master data and transactional data are available and correctly configured for the planning area.

    2. Review Configuration: Verify the configuration settings for the planning area. Check if all required settings are correctly defined in the planning area configuration.

    3. Release Locks: If the planning area is locked, identify the process or user that is holding the lock and release it if appropriate.

    4. Check Logs: Review the application logs and system logs for any additional error messages or warnings that may provide more context about the failure.

    5. Run Realignment Manually: If the automatic realignment fails, try to run the realignment process manually to see if it provides more detailed error messages.

    6. Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide patches or updates.

    7. Contact SAP Support: If the issue persists after trying the above steps, consider reaching out to SAP Support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/TS_RLG for realignment processes and /SAPAPO/MC90 for planning area configuration.
    • Documentation: Review SAP documentation related to APO realignment processes for best practices and troubleshooting tips.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker