How To Fix /SAPAPO/TS_RLG_CPY004 - Formal parameter IV_PLOBID has to be specified for realignment


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/TS_RLG_CPY -

  • Message number: 004

  • Message text: Formal parameter IV_PLOBID has to be specified for realignment

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/TS_RLG_CPY004 - Formal parameter IV_PLOBID has to be specified for realignment ?

    The SAP error message /SAPAPO/TS_RLG_CPY004 indicates that a required formal parameter, IV_PLOBID, has not been specified during a realignment process in SAP Advanced Planning and Optimization (APO). This error typically occurs when you are trying to execute a function or transaction that requires a specific parameter related to the planning object.

    Cause:

    The error is caused by the absence of the IV_PLOBID parameter, which is necessary for the realignment process. This parameter usually represents the Planning Object ID (PLOBID) that identifies the specific planning object you are working with. If this parameter is not provided, the system cannot proceed with the realignment operation.

    Solution:

    To resolve this error, you should ensure that the IV_PLOBID parameter is correctly specified in the function call or transaction you are executing. Here are the steps you can take:

    1. Check the Function Module/Transaction: Identify the function module or transaction that is generating the error. Review the documentation or the interface to understand the required parameters.

    2. Provide the Missing Parameter: Ensure that you are passing the IV_PLOBID parameter with a valid value. This value should correspond to an existing planning object in your system.

    3. Debugging: If you are developing or customizing a program, you may want to debug the code to see where the parameter is being set and why it is missing. Look for any conditional logic that might prevent the parameter from being assigned.

    4. Consult Documentation: Refer to SAP documentation or help resources for the specific function or transaction to understand the context of the IV_PLOBID parameter and how to correctly use it.

    5. Check User Authorizations: Ensure that you have the necessary authorizations to access the planning object and perform the realignment.

    6. Contact SAP Support: If you are unable to resolve the issue, consider reaching out to SAP support for assistance, especially if this is a recurring problem or if you suspect a bug.

    Related Information:

    • SAP APO: Advanced Planning and Optimization is a part of SAP's supply chain management suite, which helps in planning and optimizing supply chain processes.
    • Planning Object: In SAP APO, a planning object is a key entity that represents a specific item or group of items that are planned and managed within the system.
    • Realignment Process: This process is typically used to adjust or optimize the planning data based on new inputs or changes in the supply chain.

    By ensuring that all required parameters are correctly specified, you should be able to resolve the error and proceed with the realignment process in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker