How To Fix /SAPAPO/STOR_MSG024 - No resource is assigned to product &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/STOR_MSG -

  • Message number: 024

  • Message text: No resource is assigned to product &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/STOR_MSG024 - No resource is assigned to product &1 ?

    The SAP error message /SAPAPO/STOR_MSG024 No resource is assigned to product &1 typically occurs in the SAP Advanced Planning and Optimization (APO) module when a product is being processed in a planning run, but there are no resources assigned to that product. This can prevent the system from performing necessary planning activities, such as production planning or capacity planning.

    Cause:

    1. No Resource Assignment: The product in question does not have any resources assigned to it in the system. Resources can include machines, labor, or any other capacity that is required to produce the product.
    2. Incorrect Master Data: The master data for the product may not be set up correctly, leading to the absence of resource assignments.
    3. Resource Deactivation: The resources that were previously assigned may have been deactivated or removed from the system.
    4. Planning Area Configuration: The planning area may not be configured correctly to include the necessary resources for the product.

    Solution:

    1. Assign Resources:

      • Go to the product master data in the SAP APO system.
      • Navigate to the relevant planning view (e.g., Product View, Resource View).
      • Assign the appropriate resources to the product. This can typically be done in the "Resources" tab of the product master data.
    2. Check Resource Availability:

      • Ensure that the resources you want to assign are active and available in the system.
      • Check the resource master data to confirm that they are correctly configured.
    3. Review Planning Area Settings:

      • Verify that the planning area is set up to include the resources needed for the product.
      • If necessary, adjust the planning area configuration to ensure that it encompasses the required resources.
    4. Validate Master Data:

      • Review the master data for the product to ensure that all necessary fields are filled out correctly.
      • Make sure that the product is correctly linked to the relevant resources.
    5. Run Consistency Checks:

      • Use transaction codes like /SAPAPO/RES01 to check resource assignments and ensure that everything is consistent.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/MC62 (for product master data) and /SAPAPO/RES01 (for resource management).
    • Documentation: Refer to SAP Help documentation for detailed guidance on setting up product and resource master data.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error message.

    By following these steps, you should be able to resolve the error and ensure that the product has the necessary resources assigned for planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker