How To Fix /SAPAPO/SRC239 - SA delivery schedule lines for scheduling agreement &1 &2 will be deleted


/SAPAPO/SRC239 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SRC -

  • Message number: 239

  • Message text: SA delivery schedule lines for scheduling agreement &1 &2 will be deleted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/SRC239 - Details

  • The SAP error message /SAPAPO/SRC239 indicates that delivery schedule lines for a scheduling agreement are being deleted. This message typically arises in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with scheduling agreements and their associated delivery schedules.
    
    Cause: The error message can be triggered by several factors, including: Data Inconsistencies: There may be inconsistencies in the data related to the scheduling agreement, such as missing or incorrect entries in the master data (e.g., material master, vendor master). Scheduling Agreement Changes: If there are changes made to the scheduling agreement (e.g., changes in delivery dates, quantities, or other relevant fields), the system may determine that certain schedule lines are no longer valid and thus deletes them. Planning Run Issues: During a planning run, if the system identifies that certain delivery schedule lines cannot be fulfilled based on the current planning parameters or stock levels, it may delete those lines.
    Configuration Issues:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/SRC239 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant