How To Fix /SAPAPO/SRC131 - Next creation date for operative delivery schedule not reached


/SAPAPO/SRC131 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SRC -

  • Message number: 131

  • Message text: Next creation date for operative delivery schedule not reached

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SRC131 - Next creation date for operative delivery schedule not reached ?
    The SAP error message /SAPAPO/SRC131 indicates that the next creation date for an operative delivery schedule has not been reached. This error typically occurs in the context of Advanced Planning and Optimization (APO) when trying to create or modify delivery schedules for a product.
    
    Cause: The error is usually caused by one of the following reasons: Date Constraints: The system is trying to create a delivery schedule for a date that is earlier than the next allowed creation date. This can happen if the planning horizon is not set correctly or if the delivery schedule is being processed too early. Configuration Settings: The settings in the APO system regarding the planning and scheduling of deliveries may not be configured correctly, leading to restrictions on when schedules can be created. Master Data Issues: There may be issues with the master data related to the product, such as incorrect lead times or delivery dates that do not

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author