How To Fix /SAPAPO/SRC101 - &1 scheduling agreement items selected


/SAPAPO/SRC101 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SRC -

  • Message number: 101

  • Message text: &1 scheduling agreement items selected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SRC101 - &1 scheduling agreement items selected ?
    The SAP error message /SAPAPO/SRC101 typically relates to issues with scheduling agreement items in the Advanced Planning and Optimization (APO) module. This error indicates that there are problems with the selection of scheduling agreement items during the planning process.
    
    Cause: The error message /SAPAPO/SRC101 can be triggered by several factors, including: Data Inconsistencies: There may be inconsistencies in the data related to the scheduling agreements, such as missing or incorrect information in the master data (e.g., material master, vendor master). Planning Parameters: The planning parameters set for the scheduling agreements may not be appropriate, leading to issues in the selection process. Versioning Issues: If there are multiple versions of the scheduling agreements, the system may not be able to determine which version to use. Selection Criteria: The selection criteria used in the planning run may not match the available scheduling agreements, leading to no items being selected. Authorization Issues: There may be authorization issues preventing the user

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker