Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 828
Message text: Starting priority decomposition
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT828
- Starting priority decomposition ?The SAP error message
/SAPAPO/SNPOPT828 Starting priority decomposition
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the optimization process, particularly during the decomposition of priorities in the planning run.Cause:
- Data Issues: The error may arise due to missing or inconsistent data in the planning object structures, such as missing master data (e.g., materials, resources) or incorrect settings in the planning book.
- Configuration Problems: Incorrect configuration in the optimization settings or planning parameters can lead to this error.
- Resource Constraints: If there are insufficient resources or capacity constraints that cannot be satisfied, the optimization process may fail.
- Priority Settings: Issues with the priority settings for the planning objects can also trigger this error, especially if the priorities are not defined correctly or are conflicting.
Solution:
- Check Master Data: Ensure that all necessary master data (materials, resources, etc.) is correctly maintained and available in the system.
- Review Planning Parameters: Verify the configuration of the planning parameters and optimization settings in the APO system. Make sure they align with the business requirements.
- Analyze Resource Availability: Check the availability of resources and ensure that there are no capacity constraints that would prevent the optimization from proceeding.
- Examine Priority Settings: Review the priority settings for the planning objects. Ensure that they are defined correctly and do not conflict with each other.
- Run a Test Optimization: If possible, run a test optimization with a smaller dataset to isolate the issue and identify any specific data or configuration problems.
- Check Logs and Traces: Look into the logs and traces generated during the planning run for more detailed error messages or warnings that can provide additional context.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with SAP support or a technical consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT827
Finished resource decomposition
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT826
Finished time decomposition
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT829
Finished priority decomposition
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP_CCMS001
Client-specific monitoring context for Supply Network Planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.