How To Fix /SAPAPO/SNPOPT823 - Finished preallocation for product decomposition


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SNPOPT -

  • Message number: 823

  • Message text: Finished preallocation for product decomposition

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNPOPT823 - Finished preallocation for product decomposition ?

    The SAP error message /SAPAPO/SNPOPT823 typically indicates an issue related to the preallocation of resources during the product decomposition process in SAP Advanced Planning and Optimization (APO). This error can occur in the context of supply chain planning, particularly when dealing with production planning and scheduling.

    Cause:

    The error message /SAPAPO/SNPOPT823 can be caused by several factors, including:

    1. Insufficient Resources: There may not be enough resources (e.g., machines, labor) available to fulfill the production requirements for the product being decomposed.

    2. Configuration Issues: Incorrect configuration settings in the APO system, such as planning parameters or resource definitions, can lead to this error.

    3. Data Inconsistencies: Inconsistencies in master data (e.g., product master, resource master) or transaction data (e.g., planned orders, production orders) can cause issues during the decomposition process.

    4. Capacity Constraints: If the capacity of the resources is exceeded or if there are conflicting capacity requirements, the preallocation process may fail.

    5. Planning Version Issues: The planning version being used may not be correctly set up or may have issues that prevent successful preallocation.

    Solution:

    To resolve the error /SAPAPO/SNPOPT823, you can take the following steps:

    1. Check Resource Availability: Ensure that the resources required for the production process are available and not overbooked. Review the capacity planning and adjust as necessary.

    2. Review Configuration Settings: Verify the configuration settings in the APO system, including planning parameters, resource definitions, and product master data. Make sure they are correctly set up.

    3. Validate Master Data: Check for inconsistencies in the master data related to the product and resources. Ensure that all necessary data is complete and accurate.

    4. Analyze Capacity Constraints: Review the capacity constraints for the resources involved in the production process. Adjust the planning parameters or resource allocations as needed.

    5. Check Planning Version: Ensure that the correct planning version is being used and that it is properly configured. If necessary, create a new planning version or adjust the existing one.

    6. Run Planning Jobs: After making the necessary adjustments, run the planning jobs again to see if the error persists.

    7. Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes or updates that may address this specific error message.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for planning book) or /SAPAPO/MC90 (for capacity planning) to analyze the planning data.
    • SAP Documentation: Refer to the official SAP documentation for APO for detailed information on product decomposition and resource planning.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.

    If the issue persists after following these steps, it may be beneficial to involve your SAP Basis or APO support team for further investigation.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant