Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 432
Message text: Missing Quantity After Lead Time Analysis (Past): &1%
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT432
- Missing Quantity After Lead Time Analysis (Past): &1% ?The SAP error message
/SAPAPO/SNPOPT432 Missing Quantity After Lead Time Analysis (Past): &1%
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the planning process, particularly related to the availability of quantities after lead time analysis.Cause:
- Insufficient Stock: The system may not have enough stock available to meet the demand after considering the lead time.
- Incorrect Lead Time Settings: The lead time settings for the product may not be configured correctly, leading to discrepancies in the expected availability of quantities.
- Demand and Supply Mismatch: There may be a mismatch between the planned demand and the available supply, especially if the demand is higher than anticipated.
- Planning Version Issues: The planning version being used may not be updated or may not reflect the current state of inventory and demand.
- Master Data Issues: Problems with master data, such as incorrect product master data or location data, can lead to this error.
Solution:
- Check Stock Levels: Verify the current stock levels and ensure that there is enough inventory to meet the demand after lead time.
- Review Lead Time Settings: Check the lead time settings for the product in question. Ensure that they are set correctly in the material master and that they reflect realistic production and delivery times.
- Analyze Demand and Supply: Use the planning tools in SAP APO to analyze the demand and supply situation. Adjust forecasts or supply plans as necessary to align them.
- Update Planning Version: Ensure that the planning version being used is up to date. If necessary, refresh or re-run the planning process to incorporate the latest data.
- Check Master Data: Review the master data for the product and location to ensure that all relevant information is accurate and up to date.
- Run Heuristic or Optimization: If applicable, run the relevant heuristic or optimization process to generate a new plan that considers the current stock and demand situation.
Related Information:
/SAPAPO/SDP94
(for demand planning) or /SAPAPO/MC90
(for supply network planning) to analyze the situation further.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT431
Safety Stock Shortfall After Lead Time Analysis (Horizons): &1%
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT430
Missing Quantity After Lead Time Analysis (Horizons): &1%
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT433
Safety Stock Shortfall After Lead Time Analysis (Past): &1%
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT434
Missing Quantity After Cost Analysis: &1%
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.