Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 285
Message text: Infeasible problem
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT285
- Infeasible problem ?The SAP error message
/SAPAPO/SNPOPT285 Infeasible problem
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when the optimization problem defined in the planning run cannot be solved due to conflicting constraints or insufficient resources. Here’s a breakdown of the potential causes, solutions, and related information:Causes:
- Conflicting Constraints: The constraints defined in the planning model may contradict each other, making it impossible to find a feasible solution.
- Insufficient Resources: The resources (e.g., production capacity, storage capacity) may not be sufficient to meet the demand defined in the planning run.
- Incorrect Master Data: Issues with master data, such as incorrect product configurations, resource definitions, or planning parameters, can lead to infeasibility.
- Demand and Supply Mismatch: The demand may exceed the available supply due to incorrect forecasts or planning parameters.
- Planning Versions: The planning version being used may not be correctly set up or may contain outdated data.
Solutions:
- Review Constraints: Check the constraints defined in the planning model to ensure they are not conflicting. Adjust them as necessary.
- Analyze Resource Availability: Verify that the resources are adequately defined and available to meet the demand. Adjust resource capacities if needed.
- Check Master Data: Review the master data for products, resources, and other relevant entities to ensure they are accurate and up-to-date.
- Adjust Demand and Supply: Reassess the demand and supply data to ensure they align. Update forecasts or adjust supply plans as necessary.
- Use Feasibility Check: Utilize the feasibility check tools available in SAP APO to identify specific issues causing the infeasibility.
- Run Planning with Different Parameters: Experiment with different planning parameters or versions to see if the problem persists.
Related Information:
/SAPAPO/SDP94
for demand planning or /SAPAPO/OPTIMIZE
for optimization runs.By systematically addressing the potential causes and applying the suggested solutions, you should be able to resolve the /SAPAPO/SNPOPT285 Infeasible problem
error.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNPOPT282
Error setting up connection to application server
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT281
Error during upload to application server
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT286
Fixed partial problem cannot be solved
What causes this issue? There are fixed orders at location &V1& that trigger issues of material &V2&. In a bucket with no activities ...
/SAPAPO/SNPOPT287
Fixed partial problem cannot be solved
What causes this issue? Location &V1&, material &V2&: In a bucket without activities (production, shipment, nor external procurement,...
Click on this link to search all SAP messages.