How To Fix /SAPAPO/SNPOPT230 - PPM/PDS &1 uses two resources for sequence-dependent lot-size planning


/SAPAPO/SNPOPT230 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SNPOPT -

  • Message number: 230

  • Message text: PPM/PDS &1 uses two resources for sequence-dependent lot-size planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNPOPT230 - PPM/PDS &1 uses two resources for sequence-dependent lot-size planning ?
    The SAP error message /SAPAPO/SNPOPT230 indicates that there is a configuration issue related to the use of resources in sequence-dependent lot-size planning within the SAP Advanced Planning and Optimization (APO) module. Specifically, this error occurs when a Production Planning Model (PPM) or a Product Data Structure (PDS) is set up to use two different resources for the same operation, which is not allowed in the context of sequence-dependent lot-sizing.
    
    Cause: Multiple Resources Defined: The PPM or PDS is configured to use more than one resource for a specific operation, which can lead to conflicts in planning. Incorrect Configuration: The configuration of the resources in the PPM or PDS may not align with the requirements for sequence-dependent lot-size planning. Resource Assignment: The resources assigned to the operation may not be properly defined or may overlap in a way that is not supported by the planning logic.
    Solution: Review Resource Assignment: Check the PPM or PDS configuration to ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker