Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 069
Message text: Production process model/PDS &1: Invalid limits for lot sizes
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT069
- Production process model/PDS &1: Invalid limits for lot sizes ?The SAP error message
/SAPAPO/SNPOPT069
indicates that there is an issue with the production process model (PDS) in SAP Advanced Planning and Optimization (APO). Specifically, it points to invalid limits for lot sizes in the PDS for a given product. Here’s a breakdown of the cause, potential solutions, and related information:Cause:
- Invalid Lot Size Configuration: The lot size settings in the PDS may not be configured correctly. This can happen if the minimum and maximum lot sizes are set in a way that they contradict each other or do not align with the production process.
- Inconsistent Data: There may be inconsistencies in the data related to the production process model, such as incorrect values for lot sizes, or missing parameters.
- Changes in Master Data: If there have been recent changes to the material master, PDS, or other related master data, it could lead to this error if the changes are not compatible with existing configurations.
- Capacity Constraints: The production process may have capacity constraints that do not allow for the specified lot sizes.
Solution:
Check Lot Size Settings: Review the lot size settings in the PDS. Ensure that the minimum and maximum lot sizes are defined correctly and that they make sense for the production process.
- Go to the PDS in transaction
/SAPAPO/PDS
and check the lot size parameters.Validate Master Data: Ensure that all relevant master data (material master, PDS, etc.) is consistent and correctly configured. Look for any discrepancies that might affect the lot size limits.
Adjust Capacity Settings: If the issue is related to capacity constraints, review the capacity settings for the production process. Make sure that the production resources can handle the specified lot sizes.
Recreate or Adjust PDS: If the PDS is corrupted or incorrectly set up, consider recreating it or adjusting the existing one to align with the correct parameters.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring lot sizes and PDS settings.
Related Information:
/SAPAPO/PDS
for managing PDS and /SAPAPO/SDP94
for checking the planning book.By following these steps, you should be able to identify and resolve the issue related to the error message /SAPAPO/SNPOPT069
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT068
Transportation resource &1: Piecewise linear cost function not possible
What causes this issue? Transportation resource &V1& is modeling its usage costs (dependant on the number of vehicles) as a piecewise linear ...
/SAPAPO/SNPOPT067
Product &1: A fixed stock change is not possible
What causes this issue? Product &V1& is not valid in bucket &V2&. However, at location &V3&, it has a fixed stock change of &...
/SAPAPO/SNPOPT073
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& cannot be executed from bucket &V2& to bucket &V3& because its maximum ...
/SAPAPO/SNPOPT075
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& cannot be executed because its duration &V2& exceeds the planning horizon lengt...
Click on this link to search all SAP messages.