Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 046
Message text: Resource &1: No available capacity in time frame &2 to &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT046
- Resource &1: No available capacity in time frame &2 to &3 ?The SAP error message
/SAPAPO/SNPOPT046 Resource &1: No available capacity in time frame &2 to &3
typically occurs in the SAP Advanced Planning and Optimization (APO) module, specifically during the planning process when the system is unable to allocate resources due to insufficient capacity within a specified time frame.Cause:
- Insufficient Capacity: The resource specified in the error message does not have enough available capacity to meet the demand during the specified time frame.
- Capacity Constraints: The resource may be fully booked or constrained due to other planned orders, production orders, or maintenance activities.
- Incorrect Planning Parameters: The planning parameters for the resource may not be set correctly, leading to miscalculations of available capacity.
- Resource Availability Settings: The resource might be set to unavailable during certain periods due to maintenance or other reasons.
- Incorrect Time Frame: The time frame specified in the error message may not align with the actual availability of the resource.
Solution:
- Check Resource Availability: Review the capacity planning for the resource in question. Ensure that the resource has enough capacity available during the specified time frame.
- Adjust Capacity: If possible, increase the capacity of the resource by adjusting the settings in the resource master data or by adding additional shifts or resources.
- Review Existing Orders: Check for any existing orders that may be consuming the resource's capacity during the specified time frame. Reschedule or adjust these orders if necessary.
- Modify Planning Parameters: Ensure that the planning parameters for the resource are set correctly. This includes lead times, setup times, and any other relevant parameters.
- Check Maintenance Schedules: Verify if there are any maintenance schedules that might be affecting the resource's availability. Adjust the planning accordingly.
- Re-run the Planning Run: After making the necessary adjustments, re-run the planning run to see if the issue is resolved.
Related Information:
/SAPAPO/CC01
(Capacity Check) or /SAPAPO/SCM1
(Supply Chain Monitor) to analyze capacity issues.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT045
Resource &1: increase capacity overload is not taken into account
What causes this issue? The increase capacity of resource &V1& is being loaded with more than its available capacity between bucket &V2&a...
/SAPAPO/SNPOPT044
Resource &1: Not available or has no available capacity
What causes this issue? Resource &V1& is not available from &V2& until &V3& or has no available capacity.How to fix this erro...
/SAPAPO/SNPOPT049
Transportation resource &1: The capacity is not valid
What causes this issue? Transportation resource &V1&: The transportation capacity for each vehicle is &V2&. This value must be greate...
/SAPAPO/SNPOPT051
Transportation lane &1: Shipment duration rounded to 0
What causes this issue? The duration of a shipment using transportation lane &V1& has been rounded to 0 days.System Response The transportat...