How To Fix /SAPAPO/SNPOPT043 - Resource &1: Overload not taken into account


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SNPOPT -

  • Message number: 043

  • Message text: Resource &1: Overload not taken into account

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNPOPT043 - Resource &1: Overload not taken into account ?

    The SAP error message /SAPAPO/SNPOPT043 Resource &1: Overload not taken into account typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue related to resource planning. This message indicates that the system has detected a situation where a resource (denoted by &1, which will be replaced by the actual resource name) is overloaded, but this overload is not being considered in the planning process.

    Cause:

    1. Resource Overload: The resource in question is scheduled to exceed its capacity during the planning horizon. This could be due to an increase in demand or insufficient capacity allocation.
    2. Planning Settings: The planning settings may not be configured to account for resource overloads. This can happen if the planning strategy does not consider capacity constraints.
    3. Data Inconsistencies: There may be inconsistencies in the master data related to the resource, such as incorrect capacity settings or missing definitions.
    4. Optimization Settings: The optimization settings in the planning run may not be set to consider overloads, leading to this message.

    Solution:

    1. Check Resource Capacity: Review the capacity settings for the resource in question. Ensure that the defined capacity is sufficient to meet the planned demand.
    2. Adjust Planning Parameters: Modify the planning parameters to ensure that the system considers resource overloads. This may involve changing the planning strategy or adjusting the optimization settings.
    3. Review Demand and Supply: Analyze the demand and supply situation to identify any discrepancies. If demand has increased, consider adjusting the supply plan or increasing resource capacity.
    4. Run Capacity Planning: Execute a capacity planning run to see if the overload can be resolved by adjusting the schedule or reallocating resources.
    5. Check Master Data: Ensure that all relevant master data (e.g., resource definitions, production versions, etc.) is correctly maintained and up to date.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to capacity planning and optimization.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/MC90 (for capacity planning) or /SAPAPO/OPT1 (for optimization) to analyze and adjust settings.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on this error message.
    • Support: If the issue persists, consider reaching out to SAP support or consulting with an SAP APO expert for further assistance.

    By addressing the underlying causes and adjusting the relevant settings, you should be able to resolve the error and ensure that resource overloads are appropriately considered in your planning processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker