How To Fix /SAPAPO/SNP502 - Set activity duration to &1 day(s) in production process model/PDS &2


/SAPAPO/SNP502 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SNP -

  • Message number: 502

  • Message text: Set activity duration to &1 day(s) in production process model/PDS &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNP502 - Set activity duration to &1 day(s) in production process model/PDS &2 ?
    The SAP error message /SAPAPO/SNP502 indicates that there is an issue with the activity duration set in the Production Data Structure (PDS) for a specific production process model. This error typically arises in the context of Advanced Planning and Optimization (APO) when the system expects a certain duration for an activity but finds that it is either not set or is set incorrectly.
    
    Cause: Missing Duration: The activity in the PDS does not have a defined duration. Incorrect Duration: The duration set for the activity is not valid or does not meet the requirements of the planning process.
    Configuration Issues: There may be issues with the configuration of the production process model or the PDS itself. Data Inconsistencies: There could be inconsistencies in the data related to the production process model or the PDS.
    Solution: Check Activity Duration: Go to the PDS in the SAP system and check the activity for which the error is being raised. Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker