How To Fix /SAPAPO/SNP502 - Set activity duration to &1 day(s) in production process model/PDS &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SNP -

  • Message number: 502

  • Message text: Set activity duration to &1 day(s) in production process model/PDS &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNP502 - Set activity duration to &1 day(s) in production process model/PDS &2 ?

    The SAP error message /SAPAPO/SNP502 indicates that there is an issue with the activity duration set in the Production Data Structure (PDS) for a specific production process model. This error typically arises in the context of Advanced Planning and Optimization (APO) when the system expects a certain duration for an activity but finds that it is either not set or is set incorrectly.

    Cause:

    1. Missing Duration: The activity in the PDS does not have a defined duration.
    2. Incorrect Duration: The duration set for the activity is not valid or does not meet the requirements of the planning process.
    3. Configuration Issues: There may be issues with the configuration of the production process model or the PDS itself.
    4. Data Inconsistencies: There could be inconsistencies in the data related to the production process model or the PDS.

    Solution:

    1. Check Activity Duration:

      • Go to the PDS in the SAP system and check the activity for which the error is being raised.
      • Ensure that the duration is set correctly. If it is missing, enter the appropriate duration.
    2. Review Production Process Model:

      • Open the production process model associated with the PDS and verify that all activities have valid durations.
      • Make any necessary adjustments to the activity durations.
    3. Validate Configuration:

      • Ensure that the configuration settings for the production process model are correct and align with the requirements of your planning process.
    4. Data Consistency Check:

      • Run consistency checks on the PDS and the production process model to identify any discrepancies or issues that need to be resolved.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidelines on setting up PDS and production process models.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/PDS to access the PDS or /SAPAPO/PROD for production process models.
    • SAP Notes: Check for any relevant SAP Notes that might address known issues or provide additional guidance related to this error message.
    • Training and Documentation: Familiarize yourself with SAP APO training materials and documentation to better understand how to manage PDS and production process models effectively.

    By following these steps, you should be able to resolve the error and ensure that your production process model is correctly configured for planning purposes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author