Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 411
Message text: No alternative resources exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP411
- No alternative resources exist ?The SAP error message
/SAPAPO/SNP411 No alternative resources exist
typically occurs in the context of SAP Advanced Planning and Optimization (APO), specifically within the Supply Network Planning (SNP) module. This error indicates that the system is unable to find any alternative resources for a particular operation or production process.Cause:
Resource Configuration: The primary cause of this error is that the resources required for a specific production process are not properly configured in the system. This could mean that the resources are either not defined or not marked as alternative resources in the planning book.
Resource Availability: The resources may be defined, but they are not available for the specific time period or for the specific product being planned.
Planning Version: The planning version being used may not have the necessary resources defined or activated.
Resource Selection: The planning heuristic or optimization algorithm may not be able to select an alternative resource due to constraints or settings in the planning run.
Solution:
Check Resource Configuration:
- Go to the resource master data in SAP APO and ensure that the resources are correctly defined.
- Verify that alternative resources are set up for the relevant production processes.
Resource Availability Check:
- Check the availability of the resources in the relevant time frame. You can do this by reviewing the capacity planning and availability checks in the system.
Planning Version Review:
- Ensure that you are using the correct planning version that includes the necessary resource definitions. You can check this in the planning book settings.
Adjust Heuristic Settings:
- If you are using a heuristic for planning, review the settings to ensure that it is configured to consider alternative resources. You may need to adjust the parameters to allow for alternative resource selection.
Run a Resource Check:
- Use transaction codes like
/SAPAPO/RES01
to check the resource availability and configuration.Consult Documentation:
- Review SAP documentation or notes related to resource planning and alternative resources for any specific configurations or settings that may be required.
Related Information:
/SAPAPO/RES01
(Resource Overview), /SAPAPO/SDP94
(Planning Book), and /SAPAPO/SNP10
(SNP Planning Book).By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNP410
No location exists in the model
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP409
No resource exists in the location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP412
Transportation resources cannot be selected in this tree
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP413
Error occurred when converting time units from &2 to &3 for PPM/PDS &1
What causes this issue? Converting units of the activity duration into seconds is not possible in the production process model (PPM).System Response ...
Click on this link to search all SAP messages.