Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 071
Message text: Scheduling problem: Calendar: &1, start date: &2, end date: &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP071
- Scheduling problem: Calendar: &1, start date: &2, end date: &3 ?The SAP error message
/SAPAPO/SNP071
indicates a scheduling problem related to the calendar settings in the Advanced Planning and Optimization (APO) module, specifically in the Supply Network Planning (SNP) area. This error typically arises when there are issues with the defined calendar for the planning period, such as non-working days or incorrect date ranges.Cause:
- Calendar Configuration: The calendar defined for the planning area may not align with the dates specified in the planning run. This can happen if the calendar does not include the specified start and end dates or if there are non-working days that affect scheduling.
- Date Range Issues: The start and end dates provided for the planning run may fall outside the valid range defined in the calendar.
- Resource Availability: If resources or production capacities are not available during the specified dates, it can lead to scheduling issues.
- Master Data Issues: Incorrect or incomplete master data (like production versions, resources, or transportation lanes) can also lead to scheduling problems.
Solution:
Check Calendar Settings:
- Go to the calendar settings in the APO system and verify that the calendar includes the specified start and end dates.
- Ensure that the calendar is correctly configured to account for working and non-working days.
Adjust Date Ranges:
- Review the start and end dates used in the planning run. Make sure they fall within the valid range of the calendar.
- If necessary, adjust the planning run dates to align with the calendar.
Review Resource Availability:
- Check the availability of resources during the specified dates. Ensure that there are no constraints that would prevent scheduling.
- If resources are not available, consider rescheduling or adjusting the planning parameters.
Validate Master Data:
- Ensure that all relevant master data is complete and accurate. This includes checking production versions, resources, and any other relevant data that could impact scheduling.
Run Planning with Different Parameters:
- If the issue persists, try running the planning process with different parameters or settings to see if the error can be bypassed.
Related Information:
/SAPAPO/MC62
(to check the calendar) or /SAPAPO/SNP1
(to run the SNP planning) to investigate and resolve the issue.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNP070
Scheduling problem: Calendar: &1, date: &2, duration: &3, direction: &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP067
Product &1 of PPM/PDS &2 is not maintained for location &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP072
Invalid planning version
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP075
No location product found with consumption group '&1'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.