How To Fix /SAPAPO/SNP061 - Resource consumption has not maintained for resource &2 in PPM/PDS &1


/SAPAPO/SNP061 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SNP -

  • Message number: 061

  • Message text: Resource consumption has not maintained for resource &2 in PPM/PDS &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNP061 - Resource consumption has not maintained for resource &2 in PPM/PDS &1 ?
    The SAP error message /SAPAPO/SNP061 indicates that there is an issue with resource consumption not being maintained for a specific resource in the Production Planning and Detailed Scheduling (PPDS) or the Production Planning Module (PPM). This error typically arises when the system is trying to perform a planning operation, but it cannot find the necessary resource consumption data for the specified resource.
    
    Cause: Missing Resource Consumption Data: The primary cause of this error is that the resource consumption data for the specified resource (&2) in the PPM or PDS (&1) has not been defined or maintained in the system. Incorrect Configuration: There may be a configuration issue where the resource is not properly linked to the relevant PDS or PPM. Data Inconsistency: There could be inconsistencies in the master data, such as missing or incorrect entries in the resource master or PDS.
    Solution: To resolve this error, you can follow these steps: Check Resource Master Data: Go to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker