How To Fix /SAPAPO/SNP046 - Start date &2 for production of product &1 is in the past


/SAPAPO/SNP046 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SNP -

  • Message number: 046

  • Message text: Start date &2 for production of product &1 is in the past

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNP046 - Start date &2 for production of product &1 is in the past ?
    The SAP error message /SAPAPO/SNP046 indicates that the start date for the production of a specific product is set in the past. This error typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly in the Supply Network Planning (SNP) module.
    
    Cause: Incorrect Date Settings: The production start date for the product is set to a date that has already passed. Planning Horizon: The planning horizon may not be set correctly, leading to attempts to schedule production in the past. Data Entry Errors: Manual entry errors when inputting production dates can lead to this issue. Master Data Issues: The product master data or production data may not be correctly maintained, leading to incorrect date calculations.
    Solution: Check and Update Dates: Review the production start date for the product in question. Ensure that it is set to a future date. If the date is incorrect, update it to a valid future date. Adjust Planning Horizon: Check the planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author