How To Fix /SAPAPO/SEQ322 - Drag & Drop not possible, not enough takts are free


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 322

  • Message text: Drag & Drop not possible, not enough takts are free

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SEQ322 - Drag & Drop not possible, not enough takts are free ?

    The SAP error message /SAPAPO/SEQ322 Drag & Drop not possible, not enough takts are free typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when working with production planning and scheduling. This error indicates that there are not enough available time slots (or "takt times") to accommodate the operation you are trying to perform, such as dragging and dropping a production order or a planned order in the planning board.

    Cause:

    1. Insufficient Takt Time: The primary cause of this error is that the time slots required for the operation you are trying to perform exceed the available takt time in the schedule. This can happen if:

      • The production capacity is fully utilized.
      • There are overlapping orders that occupy the same time slots.
      • The scheduling parameters (like lead times, setup times, etc.) are not configured correctly.
    2. Capacity Constraints: If the work center or resource is already at full capacity, any attempt to schedule additional work will result in this error.

    3. Incorrect Planning Parameters: If the planning parameters (like production lead times, setup times, etc.) are not set correctly, it can lead to miscalculations of available capacity.

    Solution:

    1. Check Capacity Availability: Review the capacity of the work center or resource you are trying to schedule against. Ensure that there is enough capacity available for the operation you are trying to perform.

    2. Adjust Scheduling Parameters: If the scheduling parameters are incorrect, adjust them to reflect the actual production process. This may include:

      • Modifying lead times.
      • Adjusting setup times.
      • Ensuring that the production process is correctly defined in the system.
    3. Reschedule Orders: If there are overlapping orders, consider rescheduling them to free up the necessary takt time. You may need to move some orders to different time slots or adjust their quantities.

    4. Increase Capacity: If feasible, consider increasing the capacity of the work center or resource. This could involve adding shifts, increasing workforce, or optimizing the production process.

    5. Use the Planning Board: Utilize the planning board to visualize the current schedule and identify where the bottlenecks are occurring. This can help in making informed decisions about rescheduling or reallocating resources.

    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing capacity and scheduling in APO.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/SDP94 (Planning Board) or /SAPAPO/SCM1 (Supply Chain Management).
    • Capacity Planning: Understanding capacity planning concepts in SAP APO can help in effectively managing production schedules and avoiding such errors.
    • User Exits and BAdIs: If you have custom logic implemented, check if any user exits or BAdIs are affecting the scheduling logic.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and successfully perform the drag-and-drop operation in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author