How To Fix /SAPAPO/SEQ197 - Resource &1 has less shifts than reference calendar


/SAPAPO/SEQ197 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 197

  • Message text: Resource &1 has less shifts than reference calendar

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SEQ197 - Resource &1 has less shifts than reference calendar ?
    The SAP error message /SAPAPO/SEQ197 Resource &1 has less shifts than reference calendar typically occurs in the context of Advanced Planning and Optimization (APO) when there is a mismatch between the shifts defined for a resource and those defined in the reference calendar. This can lead to issues in scheduling and capacity planning.
    
    Cause: Resource Shift Configuration: The resource in question has been configured with fewer shifts than what is defined in the reference calendar. This can happen if the resource's shift settings were not updated to match the reference calendar. Reference Calendar Settings: The reference calendar may have been modified to include more shifts, but the resource's configuration has not been updated accordingly. Planning Version: The error may also arise if the planning version being used does not align with the shifts defined in the reference calendar.
    Solution: Check Resource Configuration: Go to the resource master data in SAP APO and check the shift settings for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant