Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 119
Message text: Firmed order in a period with no valid production version
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ119
- Firmed order in a period with no valid production version ?The SAP error message
/SAPAPO/SEQ119 Firmed order in a period with no valid production version
typically occurs in the Advanced Planning and Optimization (APO) module when there is an issue with the production version assigned to a firmed order. This error indicates that the system cannot find a valid production version for the specified time period of the firmed order.Cause:
- Missing Production Version: The production version for the material in question is not defined for the specific time period of the firmed order.
- Incorrect Validity Dates: The validity dates of the production version may not cover the dates of the firmed order.
- Configuration Issues: There may be configuration issues in the material master or production version settings.
- Changes in Master Data: Changes in the master data (like production versions or material availability) that have not been updated in the planning run.
Solution:
Check Production Versions:
- Go to the material master (transaction MM03) and check the production versions for the relevant material.
- Ensure that there is a production version defined for the time period of the firmed order.
Update Validity Dates:
- If the production version exists but is not valid for the required period, update the validity dates of the production version to include the dates of the firmed order.
Review Planning Settings:
- Check the planning settings in the APO system to ensure that the production version is correctly assigned and that the planning strategy is appropriate.
Re-run Planning:
- After making any changes, re-run the planning process to ensure that the changes take effect and that the firmed orders are updated accordingly.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for any specific configurations or settings that may need to be adjusted.
Related Information:
Transaction Codes:
Master Data: Ensure that all relevant master data (material master, production versions, etc.) is correctly maintained and up to date.
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
Testing: After making changes, it is advisable to test the scenario in a development or quality environment before applying changes to the production system.
By following these steps, you should be able to resolve the error and ensure that your firmed orders have valid production versions for the required periods.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ118
&1 orders in horizon &2 are split due to planning basis
What causes this issue? If, in a certain period, you work using the setting 'order-oriented: lot size 1", then no orders should exist in th...
/SAPAPO/SEQ117
&1 firmed orders with lot sizes other than one are split
What causes this issue? Firmed orders with a lot size not equal to 1 exist in the planning period. Orders must have a lot size of 1 to be processed i...
/SAPAPO/SEQ120
Internal program error (internal identifier &1)
What causes this issue? An inconsistency exists in the restrictions master data.System Response The system issues an error message and will not allo...
/SAPAPO/SEQ123
The standard horizon and Customizing horizon do not overlap
What causes this issue? You can specify a horizon at the start of the planning run. You have defined a further horizon for the selected procedure pac...
Click on this link to search all SAP messages.