How To Fix /SAPAPO/SEQ105 - No shift program determined for resource/production line &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 105

  • Message text: No shift program determined for resource/production line &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SEQ105 - No shift program determined for resource/production line &1 ?

    The SAP error message /SAPAPO/SEQ105 No shift program determined for resource/production line &1 typically occurs in the Advanced Planning and Optimization (APO) module when the system is unable to find a valid shift program for a specified resource or production line. This can happen for several reasons, and understanding the cause is essential for resolving the issue.

    Causes:

    1. Missing Shift Program: The most common cause is that there is no shift program defined for the resource or production line in question.
    2. Incorrect Configuration: The configuration settings for the resource or production line may not be set up correctly, leading to the inability to determine the shift program.
    3. Date Issues: The date for which the planning is being executed may not fall within the valid range of the defined shift program.
    4. Resource Not Assigned: The resource or production line may not be properly assigned to a shift program in the system.
    5. Master Data Issues: There may be issues with the master data related to the resource or production line, such as missing or incorrect entries.

    Solutions:

    1. Define a Shift Program:

      • Go to the transaction code /SAPAPO/SHIFT to create or modify a shift program.
      • Ensure that the shift program is correctly defined and assigned to the relevant resource or production line.
    2. Check Resource Configuration:

      • Verify the configuration of the resource or production line in the APO system.
      • Ensure that the resource is linked to the correct shift program.
    3. Validate Dates:

      • Check the date range for the planning run and ensure it falls within the valid dates of the shift program.
      • If necessary, adjust the planning date or modify the shift program to include the required dates.
    4. Assign Shift Program to Resource:

      • Ensure that the shift program is assigned to the resource or production line in the resource master data.
      • You can check this in the resource master data settings.
    5. Review Master Data:

      • Check the master data for the resource or production line to ensure all necessary information is complete and accurate.
      • Correct any discrepancies found in the master data.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/SHIFT for managing shift programs and /SAPAPO/RES for resource management.
    • Documentation: Refer to SAP documentation for detailed guidelines on configuring shift programs and resources in APO.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker