Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 058
Message text: Partial solution created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ058
- Partial solution created ?The SAP error message
/SAPAPO/SEQ058 Partial solution created
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a planning run (such as a heuristic or optimization run) does not complete successfully for all planned objects. This can happen for various reasons, including data inconsistencies, constraints that cannot be satisfied, or issues with the planning parameters.Causes:
- Data Inconsistencies: Missing or incorrect master data (like material master, location master, etc.) can lead to partial solutions.
- Constraints: If there are constraints in the planning run (like capacity constraints, production constraints, etc.) that cannot be satisfied, the system may only be able to create a partial solution.
- Planning Parameters: Incorrect or suboptimal planning parameters can lead to issues during the planning run.
- Resource Availability: If resources are not available or are over-allocated, the planning run may not be able to create a complete solution.
- Time Period Issues: If the planning horizon is not set correctly, it may lead to partial solutions.
Solutions:
- Check Master Data: Ensure that all relevant master data is complete and accurate. This includes checking material, location, and resource data.
- Review Constraints: Analyze the constraints set in the planning run. If certain constraints are too strict, consider relaxing them to allow for a complete solution.
- Adjust Planning Parameters: Review and adjust the planning parameters used in the heuristic or optimization run to ensure they are appropriate for the current planning scenario.
- Resource Availability: Check the availability of resources and ensure that they are correctly defined in the system. Make adjustments if necessary.
- Analyze Logs: Review the logs generated during the planning run for any specific error messages or warnings that can provide more insight into what caused the partial solution.
- Run Planning in Smaller Batches: If the planning run is too large, consider breaking it down into smaller batches to identify specific areas causing issues.
Related Information:
/SAPAPO/OM17
(to check the planning run) or /SAPAPO/MC90
(to analyze the planning results) to gather more information.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ057
Solution found, however, hard restriction could not be respected
What causes this issue? A solution was found in the optimization process. However, hard restrictions and/or delivery dates could not be respected.Sys...
/SAPAPO/SEQ056
Optimum Solution Found
What causes this issue? The optimization algorithm has found an optimal solution.System Response The system issues an error message and will not all...
/SAPAPO/SEQ059
No solution found
What causes this issue? No solution could be found in the optimization. The possible items of the orders and/or firming of the orders do not allow an...
/SAPAPO/SEQ099
Calling &1 for not supported application &2, only supporting &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.