How To Fix /SAPAPO/SEQ047 - Hard weighting of desired date for lot size greater than one not possible


/SAPAPO/SEQ047 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 047

  • Message text: Hard weighting of desired date for lot size greater than one not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/SEQ047 - Details

  • The SAP error message /SAPAPO/SEQ047 indicates that there is an issue with the hard weighting of the desired date in the context of lot sizing in SAP Advanced Planning and Optimization (APO). This error typically arises when the system is unable to apply hard constraints to the desired date for production or procurement when the lot size is greater than one.
    
    Cause: Lot Size Configuration: The error often occurs when the lot size is set to a value greater than one, and the system is trying to apply hard constraints to the desired date. Hard constraints mean that the system must strictly adhere to the specified date, which can conflict with the lot size requirements. Planning Strategy: The planning strategy being used may not support hard weighting for the desired date when dealing with larger lot sizes. Master Data Settings: There may be issues with the master data settings for the product, such as

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/SEQ047 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker