Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SDP_SB -
Message number: 108
Message text: Enter a valid start date for the read period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SDP_SB108
- Enter a valid start date for the read period ?The SAP error message
/SAPAPO/SDP_SB108 Enter a valid start date for the read period
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when working with the Supply Network Planning (SNP) or Demand Planning (DP) modules. This error indicates that the start date you have entered for the read period is either invalid or not within the acceptable range defined in the system.Causes:
- Invalid Date Format: The date entered may not be in the correct format expected by the system.
- Out of Range Dates: The date may fall outside the planning horizon or the defined periods in the system.
- Missing Configuration: The planning area or the data model may not be properly configured to accept the specified date.
- Calendar Issues: The date may not correspond to a valid working day in the calendar defined in the system.
Solutions:
- Check Date Format: Ensure that the date is entered in the correct format (e.g., YYYY-MM-DD).
- Verify Date Range: Confirm that the start date is within the valid range for the planning area. You can check the planning horizon settings in the configuration.
- Adjust Planning Area Settings: If necessary, review the configuration of the planning area to ensure it allows for the specified date.
- Use Valid Dates: Make sure to select a date that is a valid working day according to the calendar settings in SAP.
- Consult Documentation: Refer to the SAP documentation or help files for specific details on the date requirements for the transaction you are using.
Related Information:
/SAPAPO/SDP
for demand planning or /SAPAPO/SNP
for supply network planning.If you continue to experience issues after trying these solutions, it may be helpful to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SDP_SB107
Specify a key figure for the demand forecast
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SDP_SB106
Specify a key figure for the safety stock
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SDP_SB109
Enter a valid end date for the read period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SDP_SB110
Planning buckets profile '&1' not compatible with storage bkts prfl. '&2'
What causes this issue? Planning buckets profile &V1& is not compatible with storage buckets profile &V2& of planning area &V3&am...
Click on this link to search all SAP messages.