Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SDP_SB -
Message number: 007
Message text: Specify the replenishment lead time forecast level
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SDP_SB007
- Specify the replenishment lead time forecast level ?The SAP error message
/SAPAPO/SDP_SB007
indicates that the replenishment lead time forecast level has not been specified in the system. This error typically occurs in the context of Supply Chain Management (SCM) and Advanced Planning and Optimization (APO) when working with the Supply Network Planning (SNP) or Demand Planning (DP) modules.Cause:
The error is triggered when the system expects a replenishment lead time to be defined for a specific forecast level, but it is missing. This can happen due to:
- Configuration Issues: The forecast level for replenishment lead time may not be set up correctly in the system.
- Master Data Incompleteness: The relevant master data (like product master or location master) may not have the necessary information filled in.
- Planning Book Settings: The planning book being used may not have the correct settings or characteristics defined for lead time.
Solution:
To resolve this error, you can take the following steps:
Check Configuration:
- Go to the configuration settings for the planning area and ensure that the replenishment lead time is defined for the relevant forecast level.
- Verify that the planning book is correctly configured to include the lead time characteristics.
Update Master Data:
- Ensure that the product master data includes the replenishment lead time. You can do this by navigating to the product master in the APO system and checking the relevant fields.
- If you are using location-based planning, ensure that the location master data is also complete.
Review Planning Book:
- Check the planning book settings to ensure that the lead time characteristic is included and correctly defined.
- If necessary, create or modify the planning book to include the required characteristics.
Run Planning Functions:
- After making the necessary changes, run the planning functions again to see if the error persists.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on how to configure replenishment lead time in your version of SAP.
Related Information:
/SAPAPO/SDP1
(for planning book maintenance) or /SAPAPO/MC62
(for master data maintenance) to access the relevant settings.By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SDP_SB006
Specify the demand forecast error level
What causes this issue? The demand forecast error level is initial.System Response The demand forecast error is multiplied by the level of the deman...
/SAPAPO/SDP_SB005
Specify the demand forecast level
What causes this issue? The demand forecast level is initial.System Response The demand forecast is multiplied by the demand forecast level. If the ...
/SAPAPO/SDP_SB008
Specify the replenishment lead time forecast error level
What causes this issue? The replenishment lead time forecast error level is initial.System Response The replenishment lead time forecast error is mu...
/SAPAPO/SDP_SB010
Obtaining supply information for product &1 in location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.