Message type: E = Error
Message class: /SAPAPO/SDP_PI -
Message number: 063
Message text: Date has been changed to start date of the bucket &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SDP_PI063
- Date has been changed to start date of the bucket &1 ?The SAP error message /SAPAPO/SDP_PI063 indicates that the date for a planning bucket in the SAP Advanced Planning and Optimization (APO) system has been adjusted to the start date of the specified bucket. This typically occurs in the context of planning scenarios where the system is trying to align dates for planning purposes.
Cause: Bucket Configuration: The planning bucket may have been configured in such a way that it does not allow for dates outside of its defined range. Data Inconsistency: There may be inconsistencies in the data being processed, such as a mismatch between the planned dates and the bucket's defined start and end dates. Planning Parameters: The planning parameters or settings may not be correctly defined, leading the system to adjust dates automatically. User Input: A user may have entered a date that falls outside the permissible range for the planning bucket.
Solution: Check Bucket Configuration: Review the configuration of the planning buckets in the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SDP_PI062
Key figure &1 already exists in planning area &2
What causes this issue? A key figure with this name exists in the linked planning area, but it is not assigned to this planning book.System Response ...
/SAPAPO/SDP_PI061
APODPDANT can not be used as auxiliary key figure name
What causes this issue? <LB>APODPDANT</> is a reserved name for a special key figure used in the Demand Planning. Consequently, you must ...
/SAPAPO/SDP_PI064
Can not find valid bucket for the given date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SDP_PI070
Unit and event type are incompatible; unit has been removed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.