How To Fix /SAPAPO/SDP_PI063 - Date has been changed to start date of the bucket &1


/SAPAPO/SDP_PI063 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SDP_PI -

  • Message number: 063

  • Message text: Date has been changed to start date of the bucket &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SDP_PI063 - Date has been changed to start date of the bucket &1 ?
    The SAP error message /SAPAPO/SDP_PI063 indicates that the date for a planning bucket in the SAP Advanced Planning and Optimization (APO) system has been adjusted to the start date of the specified bucket. This typically occurs in the context of planning scenarios where the system is trying to align dates for planning purposes.
    
    Cause: Bucket Configuration: The planning bucket may have been configured in such a way that it does not allow for dates outside of its defined range. Data Inconsistency: There may be inconsistencies in the data being processed, such as a mismatch between the planned dates and the bucket's defined start and end dates. Planning Parameters: The planning parameters or settings may not be correctly defined, leading the system to adjust dates automatically. User Input: A user may have entered a date that falls outside the permissible range for the planning bucket.
    Solution: Check Bucket Configuration: Review the configuration of the planning buckets in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author