Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SCHED -
Message number: 867
Message text: Error in time stream calculation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SCHED867
- Error in time stream calculation ?The SAP error message
/SAPAPO/SCHED867 Error in time stream calculation
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly during the scheduling or planning processes. This error indicates that there is an issue with the time stream calculation, which is essential for determining the sequence and timing of production or planning activities.Causes:
- Data Inconsistencies: There may be inconsistencies in the master data, such as incorrect or missing time-related data (e.g., lead times, production times).
- Resource Availability: The resources required for the planned activities may not be available, leading to scheduling conflicts.
- Capacity Constraints: If the capacity of resources is exceeded or not properly defined, it can lead to errors in time stream calculations.
- Incorrect Planning Parameters: Misconfigured planning parameters or settings in the APO system can lead to calculation errors.
- Version Conflicts: If there are multiple versions of planning data, conflicts may arise during the calculation process.
Solutions:
- Check Master Data: Review and correct any inconsistencies in the master data related to materials, resources, and production processes. Ensure that all necessary time-related data is correctly defined.
- Review Resource Availability: Ensure that all resources required for the planned activities are available and properly defined in the system.
- Adjust Capacity Settings: Verify that the capacity settings for resources are correctly configured and that they align with the planned activities.
- Examine Planning Parameters: Check the planning parameters and settings in the APO system to ensure they are correctly configured for the current planning scenario.
- Analyze Logs and Traces: Use transaction codes like
/SAPAPO/OM17
(for checking the planning run) or/SAPAPO/SCM1
(for analyzing the planning log) to gather more information about the error and identify the root cause.- Consult SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide patches and updates.
Related Information:
/SAPAPO/OM17
for planning runs and /SAPAPO/SCM1
for logs.If the problem persists after trying the above solutions, it may be necessary to involve SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SCHED866
Initialization of the graphic is not supported in the SAP GUI for HTML
What causes this issue? <LS>SAP GUI for HTML</> does not support the graphic output for dates and calendars.How to fix this error? If yo...
/SAPAPO/SCHED864
Exception '&2' triggered for scheduling request '&1'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SCHED868
Scheduled Date in Past
What causes this issue? During scheduling, a date was calculated that lies in the past, although this is not allowed by your Customizing settings. It...
/SAPAPO/SCHED869
Date type is missing
What causes this issue? Configurable process scheduling does not calculate all required date types for the process alias &V1&. For this reaso...
Click on this link to search all SAP messages.