Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SAPAPO/SALES -
Message number: 126
Message text: Generated planned independent requirements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SALES126
- Generated planned independent requirements ?The SAP error message
/SAPAPO/SALES126
typically indicates an issue related to the generation of planned independent requirements (PIR) in the SAP Advanced Planning and Optimization (APO) module. This message usually arises when there are problems with the configuration or data that affect the generation of these requirements.Cause:
- Missing Master Data: The error may occur if the necessary master data (like material master, location, or product master) is incomplete or not maintained properly.
- Planning Version Issues: The planning version being used may not be set up correctly or may not be active.
- Data Consistency: There may be inconsistencies in the data that prevent the generation of planned independent requirements.
- Configuration Issues: Incorrect settings in the planning area or planning book can lead to this error.
- Time Period Issues: The time period for which the PIR is being generated may not be valid or may not have been defined.
Solution:
- Check Master Data: Ensure that all relevant master data is complete and correctly maintained. This includes checking the material master, product master, and any other related data.
- Review Planning Version: Verify that the planning version you are using is active and correctly configured. You can check this in the planning version settings.
- Data Consistency Check: Run consistency checks on the data to identify any discrepancies that may be causing the issue.
- Configuration Review: Review the configuration settings in the planning area and planning book to ensure they are set up correctly for generating PIRs.
- Time Period Validation: Ensure that the time period for which you are trying to generate PIRs is valid and defined in the system.
- Logs and Traces: Check the application logs and traces for more detailed error messages that can provide additional context on the issue.
Related Information:
/SAPAPO/MC90
(for planning book) or /SAPAPO/MC94
(for planning area) to check configurations.By following these steps, you should be able to identify and resolve the issue related to the /SAPAPO/SALES126
error message.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SALES125
Generation of planned independent requirements - selection parameters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SALES124
The planning version has not been specified
What causes this issue? You have chosen "Manual Selection" but have not entered a planning version.How to fix this error? Enter a planning...
/SAPAPO/SALES127
The time zone used is: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SALES128
The block size in process control exceeds the maximum value
What causes this issue? You have exceeded the maximum size for the processing block of a task. The maximum value is 10000. The size of the processing...
Click on this link to search all SAP messages.