How To Fix /SAPAPO/SALES104 - Planned independent requirements successfully consumed


/SAPAPO/SALES104 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SALES -

  • Message number: 104

  • Message text: Planned independent requirements successfully consumed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/SALES104 - Details

  • The SAP error message /SAPAPO/SALES104 indicates that planned independent requirements (PIRs) have been successfully consumed in the Advanced Planning and Optimization (APO) module of SAP. This message is not necessarily an error but rather an informational message indicating that the system has processed the PIRs as expected.
    
    Cause: Consumption of PIRs: This message typically occurs when the system has successfully allocated or consumed planned independent requirements against the available stock or production plans. This is part of the normal operation in the planning process. Planning Run: It may appear during a planning run where the system is adjusting the planned orders based on the PIRs.
    Solution: Since this message is informational, there is usually no action required unless it is part of a larger issue. However, if you are looking to ensure that the consumption of PIRs is functioning as intended, consider the following steps: Review Planning Parameters: Check the planning parameters and settings in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/SALES104 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author