How To Fix /SAPAPO/RSP_02032 - Target plng version is RSP version => Planning must be enabled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RSP_02 -

  • Message number: 032

  • Message text: Target plng version is RSP version => Planning must be enabled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RSP_02032 - Target plng version is RSP version => Planning must be enabled ?

    The SAP error message /SAPAPO/RSP_02032 indicates that the target planning version is set to a version that does not have planning enabled. This error typically occurs in the context of SAP Advanced Planning and Optimization (APO) when trying to execute a planning function or process that requires a specific planning version to be active.

    Cause:

    1. Planning Version Not Active: The specified planning version in the system is not activated for planning. This means that the version is either not set up correctly or has been deactivated.
    2. Incorrect Version Assignment: The planning version being referenced may not be the one intended for the planning process.
    3. Configuration Issues: There may be configuration issues in the APO system that prevent the planning version from being recognized as active.

    Solution:

    1. Check Planning Version Settings:

      • Go to the transaction code /SAPAPO/VER (or use the relevant transaction for managing planning versions).
      • Verify that the planning version you are trying to use is active and has planning enabled.
      • If it is not active, you can activate it by selecting the version and choosing the option to activate it.
    2. Review Version Configuration:

      • Ensure that the planning version is correctly configured for the planning area you are working with.
      • Check if the version is assigned to the correct planning area and that it has the necessary settings for planning.
    3. Use the Correct Version:

      • If you are using a custom version, ensure that it is the correct one for the planning process you are executing.
      • If necessary, switch to a standard version that is known to be active and configured correctly.
    4. Consult Documentation:

      • Review SAP documentation or help resources related to planning versions in APO for any additional configuration steps that may be required.
    5. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, as there may be underlying issues specific to your system configuration.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/VER for managing planning versions and /SAPAPO/MC for monitoring planning activities.
    • Planning Area Configuration: Understanding how planning areas and versions interact is crucial for effective planning in SAP APO.
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide specific fixes or updates that address known issues.

    By following these steps, you should be able to resolve the error and ensure that the planning version is correctly set up for your planning activities in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant