Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RSP01 -
Message number: 528
Message text: Order &1 has already been rescheduled in another plant
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RSP01528
- Order &1 has already been rescheduled in another plant ?The SAP error message
/SAPAPO/RSP01528
indicates that an order has already been rescheduled in another plant. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, where orders are managed across multiple plants or locations.Cause:
- Cross-Plant Rescheduling: The order in question has been rescheduled in a different plant, which can lead to conflicts if the system attempts to reschedule it again in the current plant.
- Data Consistency Issues: There may be inconsistencies in the data, such as the order being processed in multiple locations simultaneously.
- Order Status: The order may be in a status that does not allow for further rescheduling, or it may have dependencies that are not met.
Solution:
- Check Order Status: Verify the status of the order in both the current and the other plant. Ensure that it is not locked or in a state that prevents rescheduling.
- Review Rescheduling History: Look into the rescheduling history of the order to understand where and why it was rescheduled. This can help identify if the rescheduling was intentional or an error.
- Coordinate with Other Plants: If the order needs to be rescheduled, coordinate with the relevant teams in the other plant to ensure that the changes are aligned and do not conflict.
- Use Transaction Codes: Utilize transaction codes like
/SAPAPO/RESORDER
to analyze the order and its details. This can provide insights into the current state and any issues.- Consult Documentation: Refer to SAP documentation or support notes related to this error message for additional troubleshooting steps or known issues.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RSP01527
An error occurred when resetting the time series for order &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01526
A mass process has already been started
What causes this issue? Mass processing (rescheduling, daily package creation, or medium-term planning) is already running. Therefore, the order cann...
/SAPAPO/RSP01529
Order &1 has been firmed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01530
The firming of the order &1 has been lifted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.